AI data centres are limited by how much electricity they can get and how much heat they can remove.
Layer 1 · Physical & Energy · Build and run time · reviewed 2026-10-30
SimpleA plain explanation, one diagram and an analogy, with where the analogy breaks.
Guess first: Feel your legs after a run. What do busy computers need to stay cool? Show the answerLots of cooling: big fans and cold water. And lots of electricity, for the work and the cooling.
Computers get warm when they work hard, like your legs when you run. AI computers work very hard, all day and all night. So they need lots of electricity and lots of cooling.
Building one is a bit like building the power and air-conditioning for a small town. And it all goes to one room full of very busy computers.
Almost all the electricity a chip uses turns into heat, so getting power in and getting heat out are two sides of the same problem.
AI racks pack far more power into the same floor space than traditional server racks, which is why new facilities increasingly move from air cooling to liquid cooling.
Where a data centre can be built is often decided by grid connection capacity and permitting time, not by land.
Power in, heat out
Grid: power supply
Substation: plus backup
Racks: chips compute
Heat: nearly all energy
Cooling: air or liquid
Released: air or water
Like: Like a stadium on match day: the challenge isn't just building it, it's getting enough power in and enough heat out. Where it breaks: A stadium peaks for a few hours. AI clusters run near full load around the clock, so they need steady supply, not just peak capacity.
ResearchWhere the simple picture breaks, open problems and primary sources.
The Simple explanation explains power and heat for one building. Summed across a country, the totals, the sources of supply and the side effects are all contested.
How much demand. The IEA's base case has global data-centre electricity rising from about 415 TWh in 2024 to around 945 TWh in 2030, and its 2035 cases span roughly 700 to 1,700 TWh (IEA, 2025).
Efficiency versus growth. US data-centre use stayed near 60 TWh from 2014 to 2016 as efficiency offset growth, then reached 176 TWh, 4.4% of US electricity, in 2023. Whether efficiency can catch up again is unresolved (Berkeley Lab, 2024).
Who supplies it. Builders look at on-site generation or sharing a site with an existing power station. US regulators are still deciding how such co-located loads should pay for, and lean on, the wider grid (FERC, docket RM26-4).
Water. Cooling towers evaporate water on site and power stations use more off site, with no agreed way to count both. One projection puts AI's global water withdrawal at 4.2 to 6.6 billion cubic metres in 2027 (Li et al., 2023).
Security on this concept: 2 threats Pending expert review
Model weights copied out by insiders or intruders Pending expert review
Exposed
Weight files on servers and storage in data centres and labs
Staff, contractors and partners who are given access to them
Attacks
An insider or trusted recipient copying weights and sharing them
An intruder using stolen credentials to download weights from storage
Liquid cooling removes the heat for Power & cooling for AI data centres.
Energy per token includes overhead of Power & cooling for AI data centres.
More in Layer 1 · Physical & Energy
Grid connection & energy supply A big AI data centre needs a large, steady supply of electricity, and getting connected to the grid can take years, so power, not chips, often decides where and when one gets built.
Liquid cooling AI racks pack so much power into a small space that fans and cold air can no longer carry the heat away, so water-based cooling is piped right up to the chips.
Fabs & the chip supply chain Advanced AI chips depend on a handful of highly specialised factories, tools and materials.
Energy per token Each answer a model gives costs a little electricity, and how much depends on what you count: the chips, the rest of the server, idle machines and the building's cooling.