Advanced AI chips depend on a handful of highly specialised factories, tools and materials.
Layer 1 · Physical & Energy · Build and run time · reviewed 2026-10-30
SimpleA plain explanation, one diagram and an analogy, with where the analogy breaks.
Guess first: Only a few places can make the newest chips. Why might that matter? Show the answerIf one of those few places has trouble, the whole world can run short of the newest chips.
Chips are made in special factories called fabs, which are cleaner than a hospital. Only a few places in the world can make the most advanced chips.
It's like a recipe that needs a special oven that only a few bakeries own.
Making an AI accelerator involves chip design, fabrication at a foundry, advanced packaging that places memory right next to the processor, and testing.
Each step relies on specialised equipment and suppliers, and several steps are concentrated in a small number of companies and countries.
That concentration is why chip supply shows up in trade policy and export controls.
From design to server
Design: chip architecture
Fabrication: at a foundry
Packaging: joins memory
Test: and assembly
Servers: into data centres
Like: Like a relay race where some legs can only be run by one or two athletes in the world. Where it breaks: In a relay a missing runner can be replaced by a slower one. In chip-making some steps have no practical substitute at all in the short term.
ResearchWhere the simple picture breaks, open problems and primary sources.
The Simple explanation draws chip-making as a pipeline. At the leading edge several stages have one or two suppliers, so the open questions are about concentration and policy as much as technology.
One lithography supplier. A single firm makes every EUV lithography machine, and it expects its next-generation High-NA tools to support volume manufacturing only from 2027 (ASML 20-F, 2026).
Geography. In 2022 almost all leading-edge (below 10 nm) logic capacity sat in Taiwan and South Korea. An industry study projects the US could make nearly 30% by 2032 if planned fabs are built (SIA and BCG, 2024).
The cost of spreading out. The largest foundry expects overseas fabs to cut its gross margin by 2 to 3 points at first and 3 to 4 points later, while calling its AI packaging capacity very tight (TSMC, Q3 2025 call).
Export controls. US rules in December 2024 extended controls to high-bandwidth memory and more chip-making tools. Whether controls slow rivals or speed up their home-grown substitutes is contested (BIS, 2024).
Security on this concept: 1 threat Pending expert review
Hardware tampered with before it arrives Pending expert review
Exposed
Servers, network gear and accelerators in transit or at repair
Firmware on boards and baseboard management controllers
Attacks
Swapping or modifying components before delivery
Malicious firmware that survives reinstalls
Real case
No documented public incident yet
Controls
Buy through vetted channels and check delivery seals
Measured boot and firmware attestation before a server joins a cluster
Keep an inventory of firmware versions and update them under change control
Grid connection & energy supply A big AI data centre needs a large, steady supply of electricity, and getting connected to the grid can take years, so power, not chips, often decides where and when one gets built.
Liquid cooling AI racks pack so much power into a small space that fans and cold air can no longer carry the heat away, so water-based cooling is piped right up to the chips.
Energy per token Each answer a model gives costs a little electricity, and how much depends on what you count: the chips, the rest of the server, idle machines and the building's cooling.