JustujuAI, layer by layer.Open in the interactive map

Cost & Economics

Energy, chips, training runs and per-token prices: cost shapes decisions at every layer.

Cross-cutting concern, spans every layer · Draft, awaiting expert review, reviewed 2026-10-14

D1 · StoryFor young children and total beginners

Guess which costs more: building the AI, or answering one question?

Making an AI costs a lot of money. Builders pay for special chips, big buildings full of computers, and lots of power.

Then each answer costs a little too. The computers must work every time someone asks a question.

So builders look for ways to do the same job with less. One trick is to save work they did before, so they need not do it twice.

Like: Building a bakery costs a lot once; every loaf after that costs a little.

D2 · PictureFor curious beginners

Costs come in two shapes. Build cost is paid once per model: chips, data, staff and the training run. Run cost is paid on every request: the computing behind each answer, usually priced per million tokens.

Training the most compute-hungry models has grown about 2.4 times more expensive each year since 2016. Chips and staff are the biggest items; energy is only 2 to 6 percent.

Run cost grows with use and with how a question is answered. Agents use about 4 times as many tokens as a chat, and multi-agent systems about 15 times.

Much optimisation work is cost work: batching many requests together, caching repeated text (on one major platform, cached input is billed at a tenth of the normal price or less), and smaller or compressed models.

Like: Building a bakery costs a lot once; every loaf after that costs a little.
Where it breaks: A loaf costs about the same every time. An AI answer can cost a hundred times more or less depending on its length, the model, and whether an agent loops many times to produce it.

D5 · FrontierFor experts

Read the capital-spending headline with care: it mixes AI with everything else the four companies build, and filings don't split it by layer, so it can't be read as AI spending per layer.

If training costs keep rising 2.4 times a year, the largest runs would pass a billion dollars by 2027, leaving frontier development to the best-funded organisations (Epoch AI, 2024).

Cost is moving from the build to every answer. The 2026 International AI Safety Report notes that recent capability gains come largely from post-training and from extra computing at the time of use, which is paid per request.

Energy is a small share of training cost but a growing share of electricity demand: the IEA projects data-centre use to more than double to around 945 TWh by 2030.

On every layer

Sources

  1. The rising costs of training frontier AI models (Epoch AI) (2024)
  2. How we built our multi-agent research system (Anthropic) (2025-06-13)
  3. Prompt caching (Claude API documentation) (2026)
  4. International AI Safety Report 2026 (2026-02-03)
  5. IEA: Energy and AI, executive summary (2025)
  6. Navigating the High Cost of AI Compute (Andreessen Horowitz) (2023-04-27)